CTCS造句

Research on CTCS-3 Board-Ground Communication Protocol Conformance Testing Based on TTCN-3

With speeding up the construction of the passenger dedicated line with CTCS-3 train control system, it is necessary to do the research on the RBC control ability and its arrangement principle.

CTCS造句

Modeling and Realizing of On-Board Equipment of CTCS-2 Train Operation Control System with UML;

随着CTCS - 3级客运专线工程建设的加快,针对单个rbc的控制能力与RBC的设置原则进行研究很有必要。

Schema of Point with Large Number Keeping the Continuity of Bending Track Information in CTCS Level 2

Research on the Automatic Testing Methodology of CTCS-3 Onboard Equipment

The Application of 3D Scene Simulation Technology in the CTCS Level 3 Simulation System;